Guard Rail Systems has been delivering high quality workmanship for over 20 years.
Take a look at some of our previous work:
Working closely with Midcoast Council and Safedirection, Guardrail Systems had to come up with a solution to protect a critical structure supporting a bridge on the north coast rail line. Given the minimal space from shoulder and lack of drainage, the perfect solution was to trial a product that had only ever been installed to crash test. Crocguard!
Completed in stages, the Memorial Avenue project consisted of a range of products, including Quadguards, boltdown terminals and bridge approaches.
Guardrail Systems was engaged by Richard Crookes Constructions to supply and install Rhino-Stop Elite for their Pacific Cape Project
Guardrail Systems was awarded the contract for the installation of safety barriers on the construction of the Scone bypass. Due to installing the barriers after the final layer of asphalt, an extremely tight deadline had to be met. The team made sure our deadline was met with install records of 628m and 732m of ezyguard on consecutive days.
Working with the Mid Western Regional Council we were able to complete the upgrade of the Castlereagh Highway barriers in only 8 days.
Working with Baulderstone on the Karuah to Bulahdelah Pacific Highway Stage 1 we installed 3268m of guardrail including 82 terminals and 3034m flexfence wire rope.